Hard Cost Budget Breakdown
The Developer and/or Contractor must submit a detailed hard cost breakdown of the proposed work. If multiple buildings or sites are part of the overall project make-up, separate estimates must be furnished. CMC advises that overhead, profit, and general requirement documents be separate.
Cost Estimate SummaryProject Cost Analysis